最近中文字幕在线中文一页,波多野吉衣 美乳人妻,给我免费播放片在线观看,国产免费无码又爽又刺激A片

  • Product1
Epoxy flooring is a high-strength, wear-resistant, and aesthetically pleasing flooring with advantages such as seamless, solid texture, good drug resistance, anti-corrosion, dustproof, waterproof and moisture-proof, easy maintenance, and low maintenance costs. Multiple schemes can be designed according to different usage requirements, such as thin-layer coating, 1-55mm thick self leveling ground, anti slip and wear-resistant coating, mortar coating, anti-static, and anti-corrosion coating.
project
0.1~0.5mm thin layer
1-5mm self leveling
other
Paint grade
R951
R951+R952+R953
R951+R952+R953+N
colour
transparent
Grey, green, etc
Grey, green, etc
Application scope
Residential basement parking lot, general industrial plant
Business building basement parking lot, business office area, industrial factory building
Special requirements for working conditions
advantage
Strong penetration, economical and practical
Beautiful and generous
Implement special functions
1、 Surface treatment of the floor
1. The newly completed floor must undergo certain maintenance before construction, which takes about 28 days.
2. Clean the surface of cement slurry, old paint, adhered garbage, debris, and oil stains. Remove accumulated water and thoroughly dry the damp area.
3. The surface cleaning needs to be done with a dust-free cleaning machine and a large vacuum cleaner.
4. A flat surface allows gaps of 2-2.5mm, with a moisture content of less than 6% and a pH value of 6-8.
5. The surface of the floor needs to be roughened with a dust-free polishing machine and thoroughly cleaned with a vacuum cleaner.
6. Apply epoxy putty to fill and scrape holes and obvious depressions on the surface of the floor. After drying, polish and vacuum.
nine hundred
2、 Coating and sealing primer
1. When treating clean and smooth concrete surfaces, apply a scraping or roller coating of epoxy sealing primer.
2. Epoxy sealing base material has strong permeability. Adding an appropriate amount of diluent to the base coating can penetrate into the interior of the base layer and enhance the adhesion between the coating and the base layer. The coating must be continuous without interruption, and the coating amount should be based on the surface being just saturated.
3. Local overspray can be repaired with a brush, and excess primer on the surface must be polished before the next construction process.
3、 Scraping and scraping materials (approximately 1.0mm)
1. After practical application (at 25 ℃ for about 4 hours), the surface of the primer is coated with two batches of putty to ensure the wear resistance, pressure resistance, collision resistance, water, mineral oil, acid-base solution and other properties of the floor, and to adjust the flatness of the ground.
2. Use 100-200 mesh quartz sand and epoxy coating as the first layer of putty, which should be thoroughly mixed and leveled. This is mainly used to enhance the wear resistance and compression resistance of the ground.
3. Using 200‐ 270 grit quartz sand and epoxy intermediate coating, as the second layer of putty, should be thoroughly mixed and smoothed. This is mainly used to enhance the wear resistance and flatness of the ground.
4. Use a sand bag type dust-free rolling sanding machine to polish the second layer of putty and vacuum clean it.
5. After the two layers of putty have dried, if there are any rough surfaces or cracks, they should be repaired first, and then polished with a flat sanding machine to make them flat, and cleaned with a vacuum cleaner.
4、 Coating on the floor (approximately 0.2mm)
1. On the surface of the putty after polishing and cleaning (20 ℃, 24 hours), apply epoxy floor paint to the intermediate layer. The coating method can be scraping or high-pressure airless spraying.
2. This process can make the ground more level, making it easier to detect any remaining defects and facilitate the leveling of the next layer of construction.
3. This also facilitates the arrangement of equipment installation by Party A.
5、 Painted floor surface layer (about 0.8mm)
1. After the intermediate layer is dry, apply the epoxy floor layer by scraping and rolling.
2. Before painting, the intermediate layer should be vacuumed with a vacuum cleaner.
3. If the first party has installed and debugged the equipment in the middle layer, resulting in the formation of new defects on the ground, they should use scraping materials to level, polish, vacuum, clean, and then apply the surface layer.
4. After complete curing (about 24 hours), spray clear varnish.
6、 Construction precautions
1. The environmental temperature at the construction site should be above 5 ℃ and the relative humidity should be less than 85% before construction can begin.
2. The construction worker should keep actual records of the construction site, time, temperature, relative humidity, floor materials, etc. for future reference.
3. After coating application, relevant equipment and tools should be cleaned immediately.
4. After the floor is completed, it must be maintained for 15 days before entering the vehicle for use.
%
Applause Rate
favorable comment
Mid evaluation
Bad
    Comment content
    Verification code  
    久久天天躁狠狠躁夜夜不卡| 成视频年人黄网站免费视频 | 日本熟妇人妻中出| 亚洲AV久久无码精品九号| 国产又大又粗又长硬又紧又爽 | 蜜臀AV性久久久久蜜臀AⅤ| 姐姐不可以免费动漫在线观看| 狠狠色丁香婷婷第六色孕妇| 娇妻销魂的交换经历| 女人做爰全过程免费观看美女| 亚洲欧美精品无码大片在线观看| 国产老妇伦国产熟女老妇视频| 久久96国产精品久久久| 欧美交换国产一区内射| 白女人荫蒂高潮视频| 亚洲色素色无码专区| 国产av日韩a∨亚洲av电影| 视频播放器大全高清视频| 和少妇人妻邻居做爰无码| 灌牛奶cao哭男男腐纯肉打屁股| 国产一区二区三区乱码| 亚洲av永久中文无码精品综合| 被夫の上司持久侵犯日本| 办公室的交易HD在线观看| 中文乱码人妻系列一区二区| 亚洲av综合色区无码另类小说| 日本做床爱全过程激烈视频| 国产熟女露脸大叫高潮| 欧美jizz18性欧美| 99久久麻豆AV色婷婷综合| 女人18毛多水多免费观看| 国产精品素颜系列| 精品人妻无码一区二区三区| 欧美多毛肥胖老妇做爰| 成免费crm在线看系统| 女人高潮时大喊大叫正常吗| 精品一区| 午夜理理伦电影a片无码| 亚洲国产精品一区二区久久hs| 亚洲一区二区三区偷拍女厕| 亚洲国产一区二区A毛片日本|